Case Study – Agthia

Client Description  Large FMCG – Food Production Facility
Project Type  Cost Avoidance – Cost Saving
Project Location  Abu Dhabi, UAE
Client size  4500 Employees
Project Duration  05 months
Client Industry Sector  Food Manufacturing & Distrubtion

Challenge Faced:

Limited capacity in the factory limiting the ability to increase output leading to increased revenue and profitability.

Project Outcome:

• Increased capacity by 8%.
• Reduction in product waste by 15%.
• Increases product flow and customer satisfaction.

Project Deliverables:

• Review the theoretical vs actual capacity of each process in the organization, analyzing opportunities to increase capacity.
• Design a visual performance monitoring program to assist all stakeholders to understand performance in real time.
• Review waste (processes, resources, raw materials, products and time) across all processes and optimize resources.

Posted By:
Eva
Category:
Share Post:

Lets Talk